Buying a Knockdown House in Brighton: Demolition Checks Before Auction Day
A large share of the houses sold in Brighton, Brighton East and Hampton are bought by people who intend to knock them down. The block is the asset, and the house on it is something to be cleared before the rebuild. That makes sense on paper, but it means the buyer is taking on every quirk of the site: the overlays, the services, the trees, the neighbours and whatever was used to build the house in the first place.
Most of these properties are sold at auction. In Victoria, a purchase at auction carries no cooling-off period, and the same applies to a contract signed in the days just before or after an auction. Once the hammer falls, you own the problems as well as the land. This guide covers the demolition checks worth doing before auction day, and where to find the answers.
Start with the Section 32
The vendor statement, known as the Section 32, is the most useful document you will get. It contains the certificate of title, the planning zone and overlays, any building permits issued in recent years, outgoings and details of services. Read it with a demolition in mind. Look for easements on the title, which may limit where the new house can sit, and for any restrictive covenants or Section 173 agreements that control what can be built. Ask your conveyancer or solicitor to review it before you bid, not afterwards.
Check the overlays yourself
The Section 32 lists the planning controls, but it is worth pulling a fresh planning property report from the state government's VicPlan service as well. In Bayside, the overlay that most often affects a knockdown is the Heritage Overlay, which covers parts of Brighton and Hampton in particular, though vegetation and other overlays apply in some streets, so read the whole report. A Heritage Overlay does not always prevent demolition, but it means a planning permit is needed and the council will assess whether the house can go. Some post-war houses in Bayside have also been studied for heritage value in recent years. If the property sits in or near an overlay, our Permits & Heritage Approvals service can help you understand the likely path before you commit.
Outside an overlay, demolition still needs a building permit, and before that permit is issued the council has to give its report and consent under Section 29A of the Building Act. That consent is usually straightforward, but it adds time to the program.
Look at the house as a demolisher would
At the open for inspection, walk the property with different eyes. Note how the house is built: double brick, brick veneer, weatherboard, or a mix with later additions. Look at the eaves, wet areas, fences, garages and any sheds for fibro sheeting. Houses built in Victoria before 1990 can contain asbestos, and Bayside has plenty of post-war homes from the peak asbestos years. Only a licensed assessor can confirm what is there, but knowing the likely extent before you bid helps you budget. Asbestos found on a knockdown is managed through our Asbestos-Aware Demolition & Disposal service under WorkSafe Victoria rules.
Then look at the outside. A pool, tennis court, large garage or basement each add time and cost to the job, and they are handled through our Pool, Garage & Outbuilding Removal work. Note how close the house is to the boundaries, whether there are shared walls or a garage built on the boundary, and how wide the driveway is. A tight Hampton block with no side access is a different job to a wide Brighton East lot.
Trees and the street
Large trees in the front or back yard can shape the whole project. Bayside has local rules that protect many established trees, and works within their root zones may need a permit or a specific method. Street trees are council assets and cannot be removed to suit a new driveway without approval. If the rebuild depends on moving the crossover, check what the council will allow before you buy.
Services and the timeline
Before demolition, the electricity, gas, water and telecommunications supply all have to be abolished or disconnected, and the meters removed. Each authority has its own process and lead time, and they are often the slowest part of a knockdown program. If you are relying on a short settlement and a quick start, ask how long abolishments are currently taking and build that into your plans.
It is also worth thinking about the period between settlement and demolition. An empty house needs securing, and many home insurance policies limit cover once a property is left vacant for a period. Check with your insurer before settlement.
Budget for the unknowns
A demolition quote prepared from the street and a Section 32 can only go so far. What lies under the floors, inside the walls and below the slab is not always visible. Sensible buyers allow a contingency for extra asbestos, buried concrete, old footings and underground tanks, rather than assuming the first number is final.
Ask for a view before you bid
If you are weighing up a Brighton, Hampton or Sandringham property as a knockdown, we are happy to look at it before auction. A walk-through or a review of photos and the Section 32 can flag the access, asbestos, overlay and service issues that affect a Full House Demolition and Knockdown-Rebuild Site Preparation, and give you a realistic picture of the work before you raise your hand. Get in touch for a quote.
Ready to Get Started?
Contact us today for your free, no-obligation quote.
